Today, we’re diving into an exciting and incredibly practical DIY project: building your very own upholstered storage benches. These aren’t just ordinary benches; they’re multifunctional pieces designed to enhance any room, especially smaller spaces where every inch counts. In this comprehensive guide, we’ll walk you through the process of crafting durable, stylish, and supremely useful storage benches, perfect for adding both seating and hidden storage to your home. Whether you’re a seasoned woodworker or just starting, these plans are designed to be straightforward and rewarding.
I originally crafted these versatile storage benches for Madison’s bedroom, tailoring them to be 18 inches tall. This specific height allows one bench to effortlessly slide under a desk or hutch, serving as a comfortable chair for homework or creative activities. This clever design eliminates the need for a dedicated chair, freeing up valuable floor space in compact rooms. Beyond seating, these benches cleverly double as discreet storage containers, perfect for stowing away items that aren’t used daily but are too cherished to part with. Imagine tucking away blankets, books, toys, or craft supplies, keeping your space tidy and clutter-free.
Crafting Your Custom Upholstered Storage Bench: A Step-by-Step Guide
The foundation of these benches lies in their incredibly simple box construction. For the upholstered version, I opted for an economical plywood that boasts one smooth, sanded side and a rougher reverse side. The smooth side forms the interior of the storage box, providing a snag-free surface for your belongings, while the rougher exterior is perfectly concealed beneath the upholstery fabric. This material choice is not only cost-effective but also ideal for projects where the wood will be covered.
However, your material selection should align with your desired finish. If you plan to paint your bench, medium-density fiberboard (MDF) is an excellent choice. MDF offers a consistently smooth surface that takes paint beautifully, resulting in a flawless finish. For those who prefer the natural beauty of wood grain and intend to stain their benches, a high-quality cabinet-grade plywood would be more appropriate. Its superior veneer layers provide an attractive surface that readily accepts stains, highlighting the wood’s inherent character. Making the right material choice from the outset is crucial for achieving your desired aesthetic and ensuring the longevity of your project. For a deeper dive into material selection, you can refer to our guide on selecting the right materials for any woodworking project.
Essential Materials for Your Storage Bench
Gathering your materials before you begin is key to a smooth building process. Here’s what you’ll need for one storage bench:
- 3/4″ Lumber of Your Choice: This will form the main structure of your bench. Based on whether you plan to upholster, paint, or stain, select plywood (sanded on one side for upholstery, cabinet-grade for staining), or MDF for painting.
- Lumber Cut Pieces:
- 2 pieces @ 16 1/2″ x 14″ (for the front and back panels)
- 2 pieces @ 16 1/2″ x 12 1/2″ (for the side panels)
- 2 pieces @ 14″ x 14″ (one for the bottom of the box, one for the lid)
- Scrap Wood for Cleats: You’ll need either two scrap strips of lumber (approximately 1″ wide x 12 1/2″ long) or four scrap blocks of lumber (any size will do, typically 1″x1″ or 2″x2″ blocks work well). These are crucial for keeping the lid secure.
- Wood Glue: A strong adhesive is vital for reinforcing your joints, ensuring the bench is robust and durable.
- Fasteners: Finish nails and/or 1 3/4″ wood screws. Using both provides excellent strength; nails hold pieces in place while glue dries and screws provide long-term structural integrity.
- Floor Protection: Felt or plastic bumpers to attach to the bottom of the bench. These prevent scratches and scuffs on your flooring, especially if the bench will be moved frequently.
- Upholstery Supplies (if upholstering):
- Staple gun and staples: Essential for securing fabric and batting.
- Fabric: Approximately 1 yard per box is a good starting point, but this can vary depending on the fabric width and pattern repeat. Always purchase a little extra to be safe.
- Batting (optional but recommended): Adds cushioning and a professional finish to your upholstery.
Optimized Cut List for Efficiency
For those looking to maximize material usage, especially when working with standard 4×8 sheets of lumber, careful planning can yield multiple benches from a single sheet. You can efficiently build up to three benches of this size from one 4×8 sheet if you follow an optimized cut pattern. This approach minimizes waste and saves on material costs.

Recommended Tools for This Project
Having the right tools on hand will make your build significantly easier and more enjoyable:
- Measuring Tape and Pencil: For accurate measurements and marking cuts.
- Circular Saw or Table Saw: For precise lumber cuts. A miter saw can also be helpful for squaring ends.
- Drill/Driver: To pre-drill pilot holes (preventing wood splitting) and drive screws.
- Brad Nailer (optional, but highly recommended): For quickly securing pieces in place before driving screws.
- Clamps: To hold pieces together securely while glue dries and fasteners are applied.
- Orbital Sander and Sandpaper: For smoothing rough edges and preparing surfaces for finish.
- Safety Glasses, Hearing Protection, and Dust Mask: Always prioritize personal safety when woodworking.
Detailed Steps to Build Your DIY Upholstered Storage Bench
The final height of your assembled bench will be 18 inches. When preparing your lumber, ensure that the 16 1/2″ length of your front and back panels is oriented as the “Top-Bottom” portion of your box. This vertical orientation is crucial for achieving the correct overall height.
Step 1: Assembling the Side Panels
- Begin by laying out the two 14″ wide side pieces on a flat, stable surface. These will form the longer front and back panels of your bench. Position them parallel to each other, ensuring they are ready to receive the shorter side pieces.
- Next, take the two 12 1/2″ wide side pieces. These will fit inside the 14″ wide pieces. This creates a strong, flush corner joint. When assembled correctly, the box will measure 14″ x 14″ square (exterior dimensions for the sides).
- Apply a generous bead of wood glue along the edges where the pieces will meet. Wood glue is incredibly important for adding shear strength to your joints, making the bench much more durable than fasteners alone.
- Secure the joints using either finish nails, wood screws, or a combination of both. I personally find it effective to use a brad nailer to quickly tack the pieces together, holding them firmly in place while I pre-drill pilot holes and then drive in the wood screws. This method ensures everything remains square and prevents any shifting during the fastening process. Remember to use appropriate screw lengths (like 1 3/4″) that penetrate both pieces adequately without going all the way through the outer surface.


Step 2: Attaching the Bottom Panel
- With the four side panels securely joined, it’s time to attach the bottom piece of the box. Take one of your 14″ x 14″ lumber pieces.
- Apply wood glue generously along the bottom edges of all four assembled side panels.
- Carefully place the 14″ x 14″ piece onto these glued edges, ensuring it is flush with the exterior perimeter of the box. This creates a solid base for your storage bench.
- Secure the bottom panel with screws, driving them through the side panels and into the edge of the bottom piece. Again, pre-drilling pilot holes is recommended to prevent splitting, especially when working close to the edge of the wood. Space your screws evenly around the perimeter for maximum strength and stability.

Step 3: Preparing the Lid with Cleats
- The lid of your storage bench needs to be secure to prevent it from sliding around, especially when someone sits on it. This is where the cleats come in. Take the second 14″ x 14″ piece of lumber, which will serve as your lid.
- Attach your scrap strips or blocks of lumber to the underside of this lid piece. These cleats will fit inside the assembled box, acting as a guide and stopper.
- Crucial Measurement: When attaching the cleats, it’s vital to leave a 3/4″ space on all sides between the outer edge of the cleats and the outer edge of the lid. This 3/4″ allowance accounts for the thickness of your bench’s side walls (assuming you used 3/4″ lumber). This precise spacing ensures that the cleats will snuggly fit inside the box, preventing any lateral movement of the lid.
- Use wood glue and screws to firmly attach the cleats to the lid. You can use two longer strips or four individual blocks, positioned about 3/4″ in from each edge. This setup provides excellent stability and prevents the lid from shifting or falling off.


Step 4: Finishing Your Bench (Upholstery, Paint, or Stain)
Once the structural box is complete, it’s time to add your chosen finish, transforming raw lumber into a beautiful piece of furniture. Your options include upholstering for a soft, cushioned look, painting for a sleek, custom color, or staining to highlight the natural wood grain.
Upholstering Your Bench:
While upholstering can seem daunting, it’s a very achievable skill for DIY enthusiasts. My own journey involved a bit of trial and error, but the results were well worth the effort. Here’s a general overview of the process I followed:
- Add Batting: Start by laying your bench lid and potentially the sides of the box over a layer of upholstery batting. Cut the batting slightly larger than the surfaces you want to cover. This batting provides the crucial cushioning and a smooth, rounded shape beneath your fabric. Secure the batting with a staple gun, pulling it taut but not stretching it excessively. Ensure the corners are neatly folded and stapled down.
- Prepare Your Fabric: If you’re covering the entire box, you might find it easiest to sew your fabric into a large loop or cylinder shape. This creates a seamless covering. Alternatively, if your fabric is wide enough, you can drape a single piece over the box. For the lid, cut a piece of fabric large enough to cover the top and wrap around the edges to the underside where the cleats are.
- Position the Fabric: Carefully pull the fabric loop over the entire box, or drape your fabric over the lid. Align patterns if your fabric has one, and ensure the fabric is centered and straight.
- Secure the Fabric: For the lid, fold the fabric over the top edge and staple it securely to the underside, pulling it taut as you go. Focus on achieving smooth, crisp edges. When upholstering the entire box, pull the fabric firmly down over the top edge of the box and staple it to the bottom perimeter of the box. Ensure consistent tension to avoid wrinkles and sagging. Pay extra attention to the corners, folding and pleating the fabric neatly for a professional appearance. This process, while requiring patience and practice, is incredibly rewarding as you watch your bench transform.
I dedicated a full day to upholstering three benches, and it was certainly a valuable learning experience. Don’t be discouraged if it’s not perfect on your first attempt; practice makes perfect!

Painting or Staining Your Bench:
If you’ve chosen to paint or stain, ensure all surfaces are thoroughly sanded smooth. Apply a primer before painting, especially if using MDF, to ensure optimal paint adhesion and a consistent finish. For staining, always test your chosen stain on a scrap piece of the same wood to ensure you achieve the desired color. Apply multiple thin coats, sanding lightly between coats, for a rich, durable finish. Remember to seal with a clear topcoat (polyurethane, lacquer, etc.) for protection.
Step 5: Protecting Your Floors with Bumpers
The final, yet crucial, step is to protect your beautiful floors from any potential scratches or scuffs. This is especially important if you’ve stapled fabric to the bottom of your benches, as those exposed staples could easily damage delicate flooring surfaces.
- Attach felt or plastic bumpers to each corner of the bottom of your bench. These small, inexpensive additions create a soft barrier between the wood (or fabric/staples) and your floor.
- Bumpers are readily available at most hardware stores or online retailers. They often come with adhesive backing for easy application, or some require small screws for a more permanent attachment.
- Ensure the bumpers are securely fastened and provide an even base, preventing any wobbling. This simple step not only protects your floors but also allows your new storage bench to slide smoothly without leaving marks.
Important Safety Reminders and Final Advice
Before you embark on any woodworking project, always prioritize safety. Remember these critical guidelines:
- Measure Twice, Cut Once: This age-old adage is a cornerstone of woodworking. Double-checking your measurements can save you time, materials, and frustration.
- Always Use Safety Gear: Protect your eyes with safety glasses, your ears with hearing protection, and your lungs with a dust mask. Wood dust can be harmful, and power tools can be loud and dangerous if not used correctly.
- Read Tool Manuals: Familiarize yourself with the proper operation and safety features of all your power tools before use.
- Work in a Well-Ventilated Area: Especially when cutting wood, painting, or staining, good ventilation is essential for your health.
- Stay Focused: Avoid distractions while operating machinery. A moment of inattention can lead to accidents.
As always, take the time to thoroughly review these plans and ensure every step makes logical sense to you before you begin cutting or assembling. Visualizing the entire process can help identify potential issues and streamline your build. Building your own furniture is an incredibly rewarding experience, offering both practical benefits and the satisfaction of creating something with your own hands. Enjoy the process, and soon you’ll have a beautiful, custom upholstered storage bench adding functionality and style to your home!

